Have a paving, line striping, septic installation, demolition, or excavation-related question? Christy Paving & Excavating has the answer. Check out these FAQs and give us a call today for more information!
With a quality sub-base laid down, you should wait 24-36 hours before driving on your new asphalt. Letting the sub-base fully develop is critical prior to driving on it.
Asphalt should be seal coated every 2-3 years, depending on the amount of traffic the surface gets and general wear and tear.
A solid sub-base is required for any project because it will protect the integrity of your asphalt for several years.
The ideal external temperature for seal coating is 65 degrees or warmer. For laying asphalt, the ideal temperature is 50 degrees or warmer.
Chemung County, NY
Schuyler County, NY
Steuben County, NY
Painted Post, NY
and surrounding areas
Share On: